The book is finished. GIBBS: The Forgotten Warrior of the First New York Dragoons, by Garland H. Green Jr. How to order is coming soon; you can reserve a copy now. Reserve a copy →
Alfred GibbsThe research archive
Menu
Wisconsin · Gibbs Family Papers · WHS-R2-3970

George Gibbs IV (manuscript volume, ms p. n.p. (loose insert slip keyed "(a)")), 1856 (Olympia) and later additions

Repository
Wisconsin Historical Society
Date
1856 (Olympia) and later additions
Text status
Frame transcription; not reviewed during migration
Reel / frame
2 / 3970
Original source

Open original file

Frame transcription

Read against the scan. Uncertain readings and historical spelling have been retained.

(C)[?]
The width of the Nawaukum[?] is about 40 yards
The left bank of the Nawaukum[?] is [struck: about] [inserted: some] 30 feet in[?]
height (at the crossing of the road), while the right is
[inserted: not more than 6 or 8]
[struck: low], & for nearly half a mile, [inserted: is] subject to flood.
A [struck: very] careful [struck: examination] [struck: of both the river above]
[inserted: search was] [struck: been] made [struck: to ascertain] [inserted: [struck: there was]] [struck: if an accessible] [inserted: for some] point [struck: could] [inserted: con]
[struck: be found] where both banks were of a height suita-
ble for bridging, but without success. Half a mile
above the [struck: ford] road they [struck: banks] are of equal [struck: height]
but [struck: on both sides] not higher than the freshet
mark, [struck: while] and their sandy [struck: ske] material expose
them to abrasion. On the whole there seems to be no
point more suitable than the present one. The river is
there fordable at ordinary stages, but becomes exceeding
-ly dangerous when raised, [struck: and] and forms such an ob-
struction that [struck: it is recomme] a [struck: suitable] bridge, [inserted: over it] is recom-
mended as the very first expenditure on the [inserted: whole] route.
The bottom beyond will require, to render it always pas
sable, causewaying for nearly half a mile to the height
of from four to six feet. As it is very heavily timbered
& the current considerable, the [struck: timber] [inserted: trees] for the purpose
should [inserted: it is] be cut exclusively on the lower side lest the
accumulation [struck: should] of Spoil[?] should obstruct the
water ways.

Download preserved text · Download record and provenance

Transcription provenance, confidence and reading notes
---
id: R2-3970
reel: 2
frame: 3970
model: claude-opus-5-5
batch: msgbatch_01FQyNvgjfkDudnjc5Gp2f6t
pass: 1
---

## Transcription
(C)[?]
The width of the Nawaukum[?] is about 40 yards
The left bank of the Nawaukum[?] is [struck: about] [inserted: some] 30 feet in[?]
height (at the crossing of the road), while the right is
[inserted: not more than 6 or 8]
[struck: low], & for nearly half a mile, [inserted: is] subject to flood.
A [struck: very] careful [struck: examination] [struck: of both the river above]
[inserted: search was] [struck: been] made [struck: to ascertain] [inserted: [struck: there was]] [struck: if an accessible] [inserted: for some] point [struck: could] [inserted: con]
[struck: be found] where both banks were of a height suita-
ble for bridging, but without success. Half a mile
above the [struck: ford] road they [struck: banks] are of equal [struck: height]
but [struck: on both sides] not higher than the freshet
mark, [struck: while] and their sandy [struck: ske] material expose
them to abrasion. On the whole there seems to be no
point more suitable than the present one. The river is
there fordable at ordinary stages, but becomes exceeding
-ly dangerous when raised, [struck: and] and forms such an ob-
struction that [struck: it is recomme] a [struck: suitable] bridge, [inserted: over it] is recom-
mended as the very first expenditure on the [inserted: whole] route.
The bottom beyond will require, to render it always pas
sable, causewaying for nearly half a mile to the height
of from four to six feet. As it is very heavily timbered
& the current considerable, the [struck: timber] [inserted: trees] for the purpose
should [inserted: it is] be cut exclusively on the lower side lest the
accumulation [struck: should] of Spoil[?] should obstruct the
water ways.

## Page
writer: unsigned
recipient: none
place: none
date: none
kind: other

## Names, dates, numbers
Nawaukum[?]
about 40 yards
some 30 feet
not more than 6 or 8
nearly half a mile
Half a mile above the road
of from four to six feet
(C)[?]
000619

## Reading notes
- **What the page is:** a heavily revised working draft of a road or route survey report describing a river crossing. There is no date, signature or addressee.
- **River name:** the name looks like "Nawaukum" or "hawaukum" each time. It may be the Newaukum River, Washington Territory, which would suggest a military-road report. If so, it could be connected with George Gibbs rather than Alfred. This is my inference only; the page does not name the writer.
- **Lines 1–2:** Line 1 ("The width ... 40 yards") is written more cramped and looks like a later addition. Line 2 begins faintly ("The left bank of the"). "Nawaukum" in line 2 has a line beneath or through it; it may be struck rather than underlined, so this needs checking.
- **Final word of line 2:** read as "in", but it is unclear.
- **Lines 5–7:** the deletions and insertions are tangled.
  - The struck words after "careful" are a tentative reading ("of both the river above").
  - "there was" is inserted and then struck.
  - "con" is written above the struck "could" and seems to be an abandoned insertion.
- **"above" (line 9):** it is heavily inked and may be underlined rather than struck. I have left it as text.
- **"it is" (line 22):** it is inserted above "should be" and its intended place is uncertain.
- **"Spoil" (line 23):** read as "Spoil" with a capital S; it could be another word.
- **Margin mark:** the circled mark at top left may be "C" or "a".
- **Overlap:** the two images overlap from "them to abrasion" through "-ly dangerous when raised"; those lines are given once.
- **Counter:** the frame counter at the bottom shows 000619. This differs from the supplied frame number R2-3970.

## Confidence
medium - The main text is legible, but the river name, several struck words in lines 2 and 5–7, and the exact placement of some insertions are uncertain.
Website transcription retained at migration · archive record 3892
(C)[?]
The width of the Nawaukum[?] is about 40 yards
The left bank of the Nawaukum[?] is [struck: about] [inserted: some] 30 feet in[?]
height (at the crossing of the road), while the right is
[inserted: not more than 6 or 8]
[struck: low], & for nearly half a mile, [inserted: is] subject to flood.
A [struck: very] careful [struck: examination] [struck: of both the river above]
[inserted: search was] [struck: been] made [struck: to ascertain] [inserted: [struck: there was]] [struck: if an accessible] [inserted: for some] point [struck: could] [inserted: con]
[struck: be found] where both banks were of a height suita-
ble for bridging, but without success. Half a mile
above the [struck: ford] road they [struck: banks] are of equal [struck: height]
but [struck: on both sides] not higher than the freshet
mark, [struck: while] and their sandy [struck: ske] material expose
them to abrasion. On the whole there seems to be no
point more suitable than the present one. The river is
there fordable at ordinary stages, but becomes exceeding
-ly dangerous when raised, [struck: and] and forms such an ob-
struction that [struck: it is recomme] a [struck: suitable] bridge, [inserted: over it] is recom-
mended as the very first expenditure on the [inserted: whole] route.
The bottom beyond will require, to render it always pas
sable, causewaying for nearly half a mile to the height
of from four to six feet. As it is very heavily timbered
& the current considerable, the [struck: timber] [inserted: trees] for the purpose
should [inserted: it is] be cut exclusively on the lower side lest the
accumulation [struck: should] of Spoil[?] should obstruct the
water ways.
How this transcription was made. Transcribed in October 2026 by Claude, an AI model made by Anthropic, reading the scan of this microfilm frame. It has not yet been checked line by line by a person, so check names, dates and figures against the scan before relying on them. A word followed by [?] is an uncertain reading; [illegible] marks words that could not be read; nothing has been filled in. Reading confidence for this page: medium.Reading notes: - What the page is: a heavily revised working draft of a road or route survey report describing a river crossing. There is no date, signature or addressee.- River name: the name looks like "Nawaukum" or "hawaukum" each time. It may be the Newaukum River, Washington Territory, which would suggest a military-road report. If so, it could be connected with George Gibbs rather than Alfred. This is my inference only; the page does not name the writer.- Lines 1–2: Line 1 ("The width ... 40 yards") is written more cramped and looks like a later addition. Line 2 begins faintly ("The left bank of the"). "Nawaukum" in line 2 has a line beneath or through it; it may be struck rather than underlined, so this needs checking.- Final word of line 2: read as "in", but it is unclear.- Lines 5–7: the deletions and insertions are tangled. - The struck words after "careful" are a tentative reading ("of both the river above"). - "there was" is inserted and then struck. - "con" is written above the struck "could" and seems to be an abandoned insertion.- "above" (line 9): it is heavily inked and may be underlined rather than struck. I have left it as text.- "it is" (line 22): it is inserted above "should be" and its intended place is uncertain.- "Spoil" (line 23): read as "Spoil" with a capital S; it could be another word.- Margin mark: the circled mark at top left may be "C" or "a".- Overlap: the two images overlap from "them to abrasion" through "-ly dangerous when raised"; those lines are given once.- Counter: the frame counter at the bottom shows 000619. This differs from the supplied frame number R2-3970.

Wisconsin finding aid

R2-3970 · George Gibbs IV (manuscript volume, ms p. n.p. (loose insert slip keyed "(a)"))

Website image versions

The original PDF scan remains separate from these preserved website image files.

Original web image · WordPress attachment 45951

Thumbnail · WordPress attachment 46933

Reading image · WordPress attachment 49742

Source-file integrity fingerprint

SHA-256 of the preserved source file:

9dff7142aca5b97d78ca61044090da8c92520ccad396055c62c05a43fe78f87e

Source reference

Wisconsin Historical Society. George Gibbs IV (manuscript volume, ms p. n.p. (loose insert slip keyed "(a)")), 1856 (Olympia) and later additions. Gibbs Family Papers, Reel 2, frame 3970. Research record WHS-R2-3970. Working reference; archival citation details require review.